on 04-18-2019 5:18 PM
Hi all,
I am working on an inbound scenario with POSC where I have a repacking step before final putaway.
Following repacking, I want the operator to deposit to a ready for putaway zone that I configured as an intermediate storage type with LOSC (should be trigerred after step ZB01 (repack) and IB03 (putaway). For the moment, quality is not configured so the step is skipped:
When I repack one item in one HU, the LOSC is correctly trigerred:
But when I repack more than one item into one HU, LOSC is not trigerred:
Do you know the reason why LOSC wouldn't be supported in that case?
Thanks for your help
Alexis
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.