cancel
Showing results for 
Search instead for 
Did you mean: 

LOSC - Not considered if HU contain multiple products

0 Kudos

Hi all,

I am working on an inbound scenario with POSC where I have a repacking step before final putaway.

Following repacking, I want the operator to deposit to a ready for putaway zone that I configured as an intermediate storage type with LOSC (should be trigerred after step ZB01 (repack) and IB03 (putaway). For the moment, quality is not configured so the step is skipped:

When I repack one item in one HU, the LOSC is correctly trigerred:

But when I repack more than one item into one HU, LOSC is not trigerred:

Do you know the reason why LOSC wouldn't be supported in that case?

Thanks for your help

Alexis

Accepted Solutions (0)

Answers (1)

Answers (1)

tamaszsolnai
Explorer
0 Kudos

Hello Alexis,

Try it with the following LOSC Setup:

Just remove ID point and Pick Point from the LOSC configuration.

Let me know how did it went.

Tamas