Hello,
what steps do I have to perform when upgrading the following system:
SOURCE:
- OS Windows 2000 32 bit
- Oracle 8.1.6 32 bit
- SAP 46C 32 bit (46D Kernel)
TARGET:
- OS Windows 2003 64 bit
- Oracle 10.2 64 bit
- SAP ERP 2004 64 bit
In which sequence do I have to perform what steps?
First the OS, then the DB, then the SAP?
or something else?
Thanks for any help,
Michael