Either during Product Item Variant creation process, or after a Product Item Variant has been created, it is not possible to assign a material. This problem is present regardless if a change master is used to maintain a structure.
Has anyone encountered this?
System: EhP 8 with PLMWUI SP 4 (SP 4 is the latest from SAP, with SP 5 expected this week)
Note: A Change Master has been used in this scenario.
Assign a Change Master, highlight the PIV and ‘Create a New Change State’:
Enter a Material into the Material field and press Return on the keyboard:
The error ‘Unit not Defined’ is displayed.
Note: No Change Master used in this scenario.
Highlight a Product Item and, on the Product Item Variants tab, enter a new variant, a material number , a quantity, and a unit of measure.
Press Return on the keyboard:
Again, error ‘Unit not Defined’ is returned.
After an OSS call to SAP they diagnosed it as a failed BADi post upgrade.
@Patrick
Hey Patrick,
Could you please share the OSS? I have similar situation. It'd be great if you could share.
Thanks,
Harsh