Hello

I our SMD process, We have two products A and B with same routing , but , only one component is different that is assembled at operation X ( in the middle of router)

To have more flexibility, we need to work with one common product ( prodcut C) before operation X , and when arriving to this operation, the operator select which product A or B, the SFC change code material and continue the process

Does SAP ME offer the opportinuty to achieve this

We are at 6.0 version

Thank you

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Oct 06, 2016 at 07:50 AM

    Houssem

    that's the purpose of Change Production, but it's not an automatic process in 6.0 and it doesn't restrict what material changes are valid.

    Stuart

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.