Skip to Content
author's profile photo Former Member
Former Member

Null in Overrides connections

Hi masters,

I tried to override connecions from dev to prod with promotion managment in CMC and I got no connections when I check the destination server on the editor and null message. Like this:

Do you have any idea abouth this null message, and how can I override the connection promoted.

Thank you

Connections.png (21.5 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Oct 03, 2016 at 12:36 PM

    Did you setup the source first? and promoted the connection overrides?

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 03, 2016 at 03:41 PM

    I think the related issue is the follow one:

    https://launchpad.support.sap.com/#/notes/1746778

    The cause is comming to have installed 2 APS with 2 overrides database, but I checked in APS and this service has not configuration property and also I didn't find the LCM configuration property on applications.

    Dou you know where I can find this properties on BO 4.0 SP5?

    Thank you

    Oscar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.