Skip to Content
0
Former Member
Sep 27, 2016 at 01:29 PM

Automatic Inspection Lot creation after shelf life expiration date

785 Views

Hello Sapients,

I had gone through forum before posting my query regarding the automatic inspection lot creation after expiry date. Every where I came through ,that inspection lot will be created based on the next inspection date in the batch rather than shelf life . But my requirement is that , inspection lot should be generated only after the expiration date is reached but not on the next inspection date . I had maintained inspection type '09' in the material master .If I maintained Inspection interval in the material master, next time inspection date may come before the expiry date where lot will get generated, but I doesn't require lot before the expiration date . For example I had made GRN against PO with qty 500 kgs. Date of GR is 27.09.2016 and the SLED is given as 31.12.2016.If I had given inspection interval as 90 days , inspection lot will get generated on 25.12.2016, but i want the inspection lot to be generated on 01.01.2017 with inspection type 09, I tried with QA07, but when I kept the next inspection date in the batch before the expiry date only lot with 09 is generated , if I change the Next inspection date after the date of expiry , the status of the batch is changed is to restricted but the lot is not being generated.

Pls guide how to fulfill my requirement.

Thanks in advance.

Regards.

Hemanth.