Skip to Content
avatar image
Former Member

Inspection Lot

Hi Gurus ,

As per requirement from our client before start of the production process they wanted to create multiple sample for one inspection lot .

I tried with “Early inspection “ for inspection type “04” but is only generating one inspection lot per process order .

Is there any possibility to take multiple sample automatically/manually before start of the production ?

I tried with manually physical sample drawing through QPR1 but it is creating one lot for one physical sample .

Please reply ASAP .

Thanks,

Regards,

Aman

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

0 Answers