Hi Guru's,

I have created new Action which will copy the text from 1 Order to all the linked orders.

I have schedule condition which checks the text is present or not and then Set successful / failure and start condition copies text. All this happens when saving document.

In config i have Set Highest Number of Processed Actions = 1 Successful action.

My start condition executes as per config only once , but schedule condition is executed every time i save order. When i have 1 successful action execution i dont want to execute schedule condition. Any possible way to achieve this.

I have checked Parameter but didnt got any possible way for Text type check.

10 |10000 characters needed characters left characters exceeded

Hi,

Any help here.

thanks.

0
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Spencer Liang
Apr 05, 2017 at 10:16 PM
0

this is how system is designed.

schedule condition always is always evaluated whenever action determination is triggered.

check pages below

https://wiki.scn.sap.com/wiki/x/24aZGg

https://wiki.scn.sap.com/wiki/x/soaZGg

Spencer