List of reservation Created with reference to Production Orders

Hi All,


We transfer raw material from our storage location (say 0010 ) to our production floor (say 0020) by creating a reservation with the movement type 311 and the post transfer posting for that reservation in MIGO. But we now want to transfer material from storage location to production floor with reference to production order. because there must me a reference of production order as evidence that tells Why we transferred XYZ quantity of material to production floor. I have also created a reservation through MF60 (material staging).

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 09, 2016 at 02:48 AM

    Hi Muhammad,

    MF60 allow you to check what qty available on Production storage location and will deduct from your production order Reservation qty

    No production order reference is maintain in the Material document posted . it is still 311 movement type 311 and it doesn't generate any FI document.

    If you wish to issue material , you can use CO27 to issue material to Production oder . It is 261 movment type and will generate FI document. you dun need to do Backflush in this case.

    Best Regards

    Jatin

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 08, 2016 at 01:22 PM

    Hi,

    Kindly refer below document try to generate the list

    311-Transfer posting reservation against Production order through MF60

    Thanks & Regards

    Sandeep Kumar Praharaj

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 15, 2016 at 06:47 AM

    Hello Muhammad,

    As you are asking you want to transfer the material through reservation with reference to production order.. as suggested by forum members you can't do this in standard..

    the work around i.e. hope you are transferring the material through MB1B 311 Movement so please enter the production order number in the document header text, same cab be stored in the table

    through that header text you can be able to track

    Regards,

    Venkatesh..

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 08, 2016 at 12:43 PM

    Hi,

    You can use material staging MF60 for mapping this process.

    Regards,

    Amit Das

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 08, 2016 at 10:43 PM

    Hi, 311 movement is Transfer posting storage location (one-step) and it will not have the PO ref. You can create reservation through MF60 for that PO and do the 311 movement against the PO no which you can have it for your ref. Thanks Kishan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.