Skip to Content

sap pp production order link to material staging reservation

Hi all,

I want to create print out production order link to reservation number which that reservation is created using material staging (Tcode MF60).

But If I check Reservation list (Tcode MB25) and I also check table RESB there is no link between production order number and reservation number.

How can I find link between production order and reservation?

Thanks and regards

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Aug 25, 2016 at 01:11 PM

    Hello

    Indeed, if you are creating a stock transfer reservation on MF60 to cover a requirement on a storage location, there is no reference to a production order. In fact, a reservation can be created to cover requirements from several different orders, so there is no 1:1 relationship here.

    I don't see a solution using the standard or even an exit/BAdI.

    BR
    Caetano

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.