The issue is while converting the PReq using ME57 , it picks up the Fixed vendor in the source list . But we have another vendor assigned which is MRP relevant . The system should pick the other vendor .
Any possibilities ? any FM or any other suggestions
Message was edited by: Juergen L
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Stick to the name.
MRP relevant means it is considered in MRP run and assigned automatically to the requisition.
ME57 is processing already source assigned requisitions, or you assign sources manually in ME57, and if you assign manually then the MRP relevancy is not of any relevance as ME57 is not a MRP run