REM with Heijunka Sequencing

Dear Experts,

I am new to Repetitive Manufacturing scenario and we are planning to implement Heijunka Pattern in Sequencing.

As of Now I understood that standard MRP Process can be a predecessor for Heijunka and created settings as per below

1. material master with

Lot size= FX

Procurement type =E

REM profile= 0005

2. reference Routing Set

3. Production version with Reference Operation Set and Production Line(work Center)

4. MD61: Ind requirements


5. Run the MRP successfully


but unable to See the Planning table for newly created Production Line (please suggest if i am missing anything) (by using existing production line I can see the Planning Table for material)


About Customization I have done following setting


SPRO->Production->REM->Planning->Sequencing -> Planning-> Processing Profile

But here option for "Production Smoothing/leveling (Heijunka)" is not appearing

And in Transaction code LAS2 below Selection Parameters are not appearing

1. Planning Profile

2. Visualization Profile

I have created both profile in Customization.

Thanks & Regards,

Prasad Joshi

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.