Skip to Content
author's profile photo Former Member
Former Member

Determine a repayment amount Message no. TPM_TRL203

In T code TS01, this error message came up.

Diagnosis

The repayment amount of the bond could no be determined.

System Response

The system could not create the deal.

Procedure

Make sure the repayment condition is maintained in the security master date.

I saw other similar question, but I can't solve.

I think that the problem is the connection between FWZZ and TS01.

Because the cashflow is displayed in Tcode FWZZ, but in Tcode TS01, it is not displayed.

Please anyone heip me.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Aug 23, 2016 at 02:14 AM

    Hi,

    Cash flow display in FWZZ is defualt by SAP for anlaysis purpose. Please share screenshot of Condition tab and error too.

    Regards,

    Jain

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 23, 2016 at 08:48 AM

    Hi Ken,

    Check the Fima category assigned to 263, it should be TTEN.

    Also check note 1176422.

    Regards, Feng

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.