show a material in MRP list without planning?

Hello,

Would it be possible to show a material in the MRP list without planning?

When we use MRP type 'RE' for a material, it is not planned, but it doesn't show in MD05 either.

So the client asks if it would be possible to show in MD05 without planning, for revision purposes.

Is this possible?

Maybe using a user exit?

Thank you

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Aug 22, 2016 at 03:01 PM

    Hi Christophe,

    Sorry, but I didn't understand your question.

    With the MD04 or MD05 is possible to see the MRP type

    If you need to do a revision in the material master, you can to generate a report by MM60 and to do a filter for MRP type.

    Best regards.

    José Dallagnese


    Add a comment
    10|10000 characters needed characters exceeded

    • Hello

      The MRP List should always store the results of the last MRP run, therefore, if the material was not planned by MRP, the MRP list should not be updated. This information is very important for troubleshooting and for a better understanding of the MRP results.

      As far as I know, it is not possible to update the MRP List information without actually planning the material and I think that it would be inconsistent.

      BR
      Caetano

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.