Skip to Content

Up-gradation from PI 7.1 to 7.4 Dual stack

Hi Folks,

could you please tell me what will be the impact if we up-grade our current PI 7.1 version to 7.4 dual stack and what are the steps we need to follow before and after up-gradation.

we have ccBPM scenarios in our current version. if we upgrade to 7.4 dual stack, i guess those interfaces also will migrate automatically?

Regards,

Janardhan

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Posted on Aug 22, 2016 at 11:27 AM

    one more thing is, we need to transport the objects manually or once up-gradation done all objects will update automatically?

    Regards,

    Janardhan

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 22, 2016 at 09:14 AM

    Hi Janardhan, 1 .After Up-grade - First you can do the spau activity and you can change the adapter meta data update. 2. Yes Regards Srinivas

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 22, 2016 at 09:34 AM

    Hi Janardhan,

    This link can be helpful for you Configuring Process Integration (PI) After Installation - SAP Library

    Like before actions, i test the scenarios and i write down the results to compare these tests in the future with the PI upgrade results.

    Regards.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.