Skip to Content

Migrate SLD object from PI7.1 to PI7.4

Dear All,

Anybody has better solution to migrate the SLD object(technical system, business system, product, software) and ESR object(namespace, service interface and so on) to the new PI7.4. I know that there is one method. SLD->Administration->Synchronization. BUT I want to change the business system name. I am not sure that the solution is best?

Many thanks & best regards,

Hubery

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Aug 21, 2016 at 01:31 PM

    Hi Hubery,

    Could you check note 2068999 - Migrating an SLD

    It might be helpful.

    Best regards,

    Bence

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 22, 2016 at 12:29 PM

    Hello Hubery,

    • Typically you perform a export import of the SLD objects if you do not want to use the SLD auto sync option.
    • if you want to rename the business system, the option is to expirt import the technical system and then manually create only the business system with the new naming convention.
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.