Skip to Content
author's profile photo Former Member
Former Member

Overhead Allocation from Cost Centre to production order

Hi

Can any body help me how to allocate the overhead cost from cost centre to production order

kindly suggest the necessary step

thanks

Trinath

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 20, 2016 at 01:46 AM

    Hi Trinath,

    You have a functionality called costing sheet to calculates the overhead in SAP, based on calculation bases, credit keys and percentage overhead rates, system will calculates the overhead and in the month end once you execute the actual overhead calculation (KGI2/CO43), the actual over head will load on to the order and the cost center maintained in the credit kays configuration will credit with overhead cost element. Based on the percentage maintained and cost will consider the calculation base cost elements maintained in the calculation bases.

    I hope it is clear.

    Regards,

    Ravi

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.