Hi Gurus,

I have a small problem. Once MRP relevant changes done in material, changes are logged in MDVM with timestamp USTMP and change indicator NETCH. but again if I do any MRP relevant change in material, it still shows the old timestamp unless MRP is run and clears the change indicator. Please help.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Aug 18, 2016 at 11:36 AM

    are you posting with 2 user IDs?

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 18, 2016 at 12:23 PM

    Would you expect a change in other data beside of the timestamp ? If no other fields in the planning file would get new values then why should an update be made to the creation date?

    you may want to check OSS note 205681 - MRP: Planning file entry for material requirements planning

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.