Auto updation of revision level in old BOM's

Hi All,

I have issue regarding revision level of components getting auto updated in old BOM's

for e.g.

I have X material as BOM header. BOM is order BOM created through CS61 and it is copied from material bom having usage '2'.

Components of BOM along with revision level are :

Component A With revision level '01'

Component B With revision level '01

Now Components A undergoes the revision change so revision level is '02'

ideally revision level should not get auto updated old BOM's. However system auto updates all the sales order BOM's with new revision level.

I want a record of which revision levels of components are supplied with old machines.

Kindly Suggest.

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 18, 2016 at 05:21 AM

    Hi Ranga,

    Order BOM parks Production/Engineering BOM at the time of creation of Sales Order . It is static and further changes in engg/prod BOM are not prevented from appearing in Sales Order BOM. There is no way material related changes can be prevented. For example , if you change Material description in the MM02 , Sales order BOM will display new description. Similarly revision level will too.

    From business standpoint:

    If revision level only changed , 3F(Form , Fit and Function same as old part) are ensured , so customer wouldn't mind new revision level part for replacement.

    Regards

    Jatin

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Ranga P

      Hi Ranga,

      You can activate Revision level of finished goods same way as revision level of Raw materials. You have to put process to manually up the revision level of BOM by engineering personnels

      And there is BOM display by revision level , so if you supply Revision level of Finished goods , system will display BOM applicable at the time when revision level was changed to higher one.

      Test it out , I think it should work.

      Best Regards

      Jatin

  • Posted on Aug 17, 2016 at 07:22 PM

    Hi,

    Does this revision level change of material happens with Change Number? I guess it is a matter of date it is valid from - if you have it valid before the order validation it sounds like a proper system behaviour.

    BR,

    Tomek

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.