Issue in Rate routing selection in CEWB, CA85N and CA95N

Hello All,

I want to do a mass change of the machine time and deletion of the operation in the rate routing,

And i am trying to do this activities through CEWB, CA85N and CA95N, But When i gave the selection parameters data is not getting fetched.

I have checked the input selection parameters which i gave in the above three. in the table MAPL, PLKO and PLPO and found it to be correct.

In all the above three t-code i have used following selection parameters,

  • Task list type - R rate routing
  • Group
  • Group counter
  • Plant

Kindly help me to over come this issue.

Regards,

Manoj

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Aug 17, 2016 at 10:35 AM

    Hello,

    Implement SAP note 216493 and 614800- Additional task list types in the engineering workbench

    to edit task list types R rate routing.

    Best Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.