Hi
Gurus,
Im a PP consultant, don't have much expertise in CO. Im using production versions for a material. Each material has 2 routings which are assigned in production versions. Both routings have different workcenters and those workcenters have different cost centers. My client wants to do a costing run. He wants to see costing impacts in both lines of the same material separately. In ck11n system shows option for Production version selection, by this I assume his requirement can be fulfilled. But he wants to use CK40n. Is there any way to full fill this requirement. Kindly let me know if I wasn't able to properly communicate the technicalities of this issue. Below are the screen shots of ck11n and ck40n.
Below is CK11n
below is CK40n
Thanks,
Shankar