Skip to Content
0
Aug 16, 2016 at 07:31 PM

Costing variant and Production version

2356 Views

Hi

Gurus,

Im a PP consultant, don't have much expertise in CO. Im using production versions for a material. Each material has 2 routings which are assigned in production versions. Both routings have different workcenters and those workcenters have different cost centers. My client wants to do a costing run. He wants to see costing impacts in both lines of the same material separately. In ck11n system shows option for Production version selection, by this I assume his requirement can be fulfilled. But he wants to use CK40n. Is there any way to full fill this requirement. Kindly let me know if I wasn't able to properly communicate the technicalities of this issue. Below are the screen shots of ck11n and ck40n.

Below is CK11n

below is CK40n

Thanks,

Shankar

Attachments

CO.jpg (56.7 kB)
CO2.jpg (45.4 kB)