Hi experts,
We are using REM manufacturing. we want planned order dates with lead time as below:
In house production time: 3 days
PIR date : 16.08.2016
Planned order date to be: 13.08.2016 as per client requirement.
I am using backward scheduling. I have tried as below
MRP run with parameter 1 3 1 3 2. i am getting result
Kindly suggest how can get result according lead time. or any other option to achieve results.
Best regards,
Santosh Sharma
Hello,
Lead time scheduling will consider the operation time defined in routing and in basic date scheduling system will schedule the order as per the material master lead time and no capacity requirements will be generated.
Please refer SAP help document,
Calculating Production Dates (Lead Time Scheduling) - Planning Process - SAP Library
and Basic dates and Lead time scheduling (MRP Param... | SCN
Best Regards,
R.Brahmankar
Add a comment