Planning fields are set to read-only after mapping with TPM spend type

Hi Experts,

We are implementing Key Figure Planning for Trade Promotion.

On CRM side: ZEXP_ZT01 is mapping to an expense type ZT01. It is read-only in the planning layout when I click Planning in a trade promotion through Webui. But it is expected to be input ready for planning input purpose.

In BW-BPS side, we have the following planning objects that copied from standard BI content object by replace the beginning 4 with Z:

ZTPM9000 Multi area with single area ZTPM8000(point to realtime cube that copied from 0CP_SLSCA, data slice in ZTPM8000 deleted)

ZTPM9710 Planning layout on ZTPM9000

ZTPM9710 Planning Profile with ZTPM9000 and all sub-object


Key figure: ZEXP_ZT01 is created by template of 0AMOUNT, which is add to the real time cube and correspondingly planning level/layout.

In Planning Layout ZTPM9710, ZEXP_ZT01 is added in the data columns with comparison column unchecked. When I run the layout in BPS0, planning data can be uploaded into the real time cube.

In UPX_MNTN Key Figure Scheme tab, its display only checkbox is unchecked, nor there is any calculated key figures in the scheme. When I run preview in the tab beside key figure scheme tab, the field can be input.

What's weird is:

- It is not only read-only but also it won't read the planning amount in the cube(those I upload for BPS0 layout)

- when I clear the mapping to the expense type, it is inputable, but wont show the amount in the cube either, but the amount can be upload to the cube.


So from BW side, it is input ready, is there anything I missed to configure to make it input ready on the crm web ui?


Best Regards,

Geegee

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Aug 17, 2016 at 01:00 PM

    Hello,

    are you using CRM or BI rates? When using CRM rates the trade spend value is to be edited in the trade spend assignment block directly, in that case the value is synchronized with BPS but not editable in the BPS planning layout. In case of BI rates the spend value can be edited in the planning layout only.

    Please check the Define Rates' Origin customizing for TPM accordingly.

    best regards,

    Johannes

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.