Hi,

Please explain with example what is the use of variable size in BOM and tell if any parameter we to maintain
Acually i have one senario Raw material i have received ROD of 50 MM DIA X 100 M length and this raw material i sent to Work center-1 then the output from that work center-1 is 46.5MM X 8 M Length.
this think we can map it in BOM variable size if yes guide me to do MAP it in sap.
Regards,
LEO