Planning element tick default at WBS

Hi All,

My requirement is to get default check of 'planning element' when I'm going to create WBS so for that purpose, I have created substitution and prerequisite and apply that substitution on project profile but after that, I'm still not getting planning element tick default. Below is screen shot of substitution.

Regards,

Faizan

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 12, 2016 at 06:54 AM

    Hi Faizan,

    Your pre-requisite condition and substitution condition should not same otherwise it wont work.

    Let's say you want to apply this substitution for project profile 'CP', then change the pre-requisite condition to PROJ-PROFL = 'CP' and keep the substitution as is.

    Hope this helps.

    Best regards

    Aditya

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.