Hi team,
I am very new to handle the PLM issues.Please advice your valuable suggestion on the below issue.
- Client PLM system allows to distinguish between a revision level on a material of for example, 1 and 01. When they try to create a revision level of 1 using the CC11 transaction code in SAP automatically changes 1 to 01.
- Theyuse a bapi to enter 1 but then all the screens which use revision level eg. Purchase order screen, cannot find the 1 as they automatically look for a 01.
- This makes the revision level between thier PLM system and business system out of alignment.
- They need a way to replicate exactly our revision level in our PLM and in SAP by switching off the addition of a 0 in all screens that use revision level.
- This issue only occurs for single digit numbers.
- As per client,their external PLM allows a revision level of 1,2,3 etc why does SAP force to use 01,02,03 etc.
- As they are using external revision level in t-code OS54, SAP should allow them to use exactly the rev level as thier PLM uses.
- With the current use of 01 in SAP they are out of sync of thousands of part numbers.
- Customer need a way to switch off the leading zero for numerical revision levels so both PLM and SAP.
Regards,
Theja