Skip to Content
0
Aug 11, 2016 at 02:32 PM

Changing First Date(VBEP-EDATU) problem - MV45AFZZ

1848 Views

Hello,

At VA01and VA02; I want to change VBEP-EDATU at the time we change VBAK-VDATU.

In which user exit we should do this?

Notes : I tried to change XVBEP at user exits , and after that I can see EDATU changed, but the problem is after saving system creates 2 schedule lines. First one has the new date and the second one has the previous date. We simply want to have one schedule line in the end(with updated date)

Is there anyway to update VBEP-EDATU after I change VBAK-VDATU with single schedule line?

Sincerely.