Integration of Work Order comming from ERP on SAP ME

Hi Experts,

I have one particular question for the Work Order Integration, if I understand correctly, when the Preventive Maintenance Order is sent to SAP ME, the status of the ME Resource is going to be changed to "Schedule Down", is there a standard procedure to avoid this behavior?

I want to send the Preventive Work Order to SAP ME, but I do not want to change in automatic the status to Scheduled Down.

Thanks for any suggestion guys.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Aug 11, 2016 at 04:02 PM

    Hi,

    You need to modify the Equipment Status Change Request XSLT in MII. The standard XSLT changes status to 4 - scheduled down. Change this to 1 - Productive for example

    Thanks


    Steve

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.