cancel
Showing results for 
Search instead for 
Did you mean: 

Creation of reorder point for ROH material but practically how will it perform

Former Member
0 Kudos

Hi Expert,

I have created Raw material with VM( Automatic reorder point) in MRP view 1 and also set Reorder point 200 Kg and safety stock as 150 Kg but after issuing the goods ,It is not taking care of safety stock and also How to obtain automatic reorder point in MRP? The stock is still showing below the safety stock and below the reorder point.Please guide me how to run it practically? What is the use of reorder point if it wont work automatically?

Best Regards

Sumit Sinha

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello Sumit,

MRP Group  0031 assigned to this material that check if any share of the safety stock used to cover requirements.

An order proposal will be only created if the the stock level has fallen below the safety stock available for planning.

Best Regards,

R.Brahmankar

Former Member
0 Kudos

Hi Brahmankar,

Thanks, As per my understanding we create reorder point to avoid any excess lead time. Suppose I created a production order which consume stock level of ROH material below its reorder point and also below its define minimum safety stock,Then is there any way to run MRP automatically when it reaches below its reorder point? If not then how will we avoid lead time to bring the material for the next production order creation? Hope you understand my points.

Also i observe during MRP run of FG product in MD02, Purchase requisition will not be created for ROH material which is set as reorder point in MRP1 View, So during production order creation time only we will get to know that we are not having sufficient stock.

Hope you understand my point now.

Best Regards

Sumit Sinha

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

Then is there any way to run MRP automatically when it reaches below its reorder point? If not then how will we avoid lead time to bring the material for the next production order creation?

There is no way to trigger MRP automatically in standard SAP.  You set the workflow MDDISPONENT  MRP Controller Workflow to inform MRP controller to run MRP.

Or you can schedule the batch job for MRP in background through MDBT.

Best Regards,

R.Brahmankar

former_member194456
Contributor
0 Kudos

Also as per my understanding you have to run the MD01 so that system will generate the requirement for the material having reorder level.

Requirement through FG OR MRP run for FG only through MD02 will not generate the requirement for the material having reorder level planning.

Former Member
0 Kudos

Hi ,

Thanks for the information.

Best Regards

Sumit sinha

Former Member
0 Kudos

Yes i agree, We should run MRP separately for Reorder level planning .

Former Member
0 Kudos

Hi Brahmankar ,

you told that

MRP Group  0031 assigned to this material that check if any share of the safety stock used to cover requirements.

But now i changed it and it is still going below minimum safety stock level,If it is happened like this then What is the use to keep minimum stock level in MRP2 view? Please look below screenshot

Answers (3)

Answers (3)

dimasluis_defaria
Active Participant
0 Kudos

Hi Sumit

Check:

Forecast  material master or below

Regards

Dimas Faria

Former Member
0 Kudos

Hi Dimas,

Thanks for at least your reply , But I am not able to understand it.

What i need to maintain here? Actually my point is If i set reorder point then automatically MRP should run when my stock level come under 200 ,Also if i set my minimum safety stock as 100 then how good issue is happening during production order released?

Best Regards

Sumit Sinha

former_member194456
Contributor
0 Kudos

Hello

For MRP type VM, you have to do the following

1. enter the data of the past consumption in the forecasting view in material master

2. also maintain the service level in the material master.

This will help to determine the Reorder and Safety stock.


If you don't want to use automatic determination of the reorder point and safety stock than go for MRP type VB.

Try to run MD01 and than see the results in MD04 for the material.

Also have a look on the following documents

Reorder Point Planning - MRP Procedures - SAP Library

MRP run will not consider the dependent requirement for the reorder level raw material.

Hope this help

Regards

SS

solomon_macwan
Active Contributor
0 Kudos

Hi Sumit,

MRP run will not change the reoder point. You have to run the forcasting to set the automatic reorder point.

your setting is correct. just run the MP30 and check your reorder point.

regards,

Solomon

Former Member
0 Kudos
Former Member
0 Kudos

Also while running the MRP for FG product in MD02 ,There is no purchase requisition created for ROH material. So why it is required to run MRP for ROH material separately each time?

Best Regards

Sumit Sinha

Former Member
0 Kudos