Skip to Content
author's profile photo Former Member
Former Member

Hard Code in HANA Modelling

Hi experts,

In HANA Modelling is there any way to give a hard coded value??

My requirement is : i need to give "$" symbol in front of the Calculated measure. Screen shot attached.

In this the Value should show along with "$" symbol. can we give hard coded?? or is there any other way??

Capture.JPG (92.2 kB)
Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Aug 09, 2016 at 07:51 AM

    Hello

    It is possible in a calculated column, but as a measure is typically a numeric datatype, and you require a hard-coded string prefix, here's your issue.

    Typically, the consumption layer performs formatting of data values rather than the model.

    Michael

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.