Closing PCNF and open inspection lot TECO Process Orders

857 Views

Hi,

I am trying to mass close (CLSD) some process orders (all TECO) through COHVPI but there are some that cannot be closed because of 2 reasons:

  1. They have PCNF and TECO status
  2. They have in-process (03) inspection lots left without a UD

I tried the following solutions but experienced further issues highlighted:

  1. Tried using COHVPI to assign CNF status but it said operations from the orders need to be confirmed
  2. Take a mass UD on all in-process lots. Some were successful and others required batch assignment (manually) which isn't possible because these lots are old (some several years) and their stock etc is done and gone

How can I close those orders with PCNF TECO status and those with open lots and lots stuck asking for batch assignment?

Individually will be a pain since the volume is quite high.

Thanks,

Bilal