Planned order dates calculation with PDT.

former_member213946
Participant
0 Kudos

Hi team,

i have gone through links but unable figure out below planned order dates behavior.

material master- PDT.- 13 days

mrp run with option 02- pr in opening period.

SMK-

Cust order dated 02.08.2016

How planned order is created instead of purchase requisition. In which case pr could have been created.

as today is 5th aug if calculated from 21 st july todays is date is in opening period PR could have been generated.

As in below scenario 2- from date 02.08.2016 indp req. it has calculated forward 13 days +  and created PR and after opening period created planned order.

md04.

planned order dates details

calender

scenario-2

As in below scenario 2- from date 02.08.2016 indp req. it has calculated forward 13 days and created PR and after opening period end created planned order.

refered -Opening period | SCN

pls suggest.

best regards,

sanket.

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

What is ther parmater of MRP run? Is there any MRP group assigned to material master?

Refer SAP consulting note  23922 - MRP: Creation indicators, PReq. or planned order

An opening period of 0 days means that, together with the indicator "Create req. order" from "2", purchase requisitions can be created only if the opening date is the same as the planning date.

For reorder point planning, the requirement date is set to the planning date when there is a shortfall of reorder point.

Therefore, if scheduling is carried out on a non-working day, the requirement date is set to a non-working day and the delivery date or start and opening dates are set to the previous working day.

As a result, the opening and planning dates no longer fall on the same day and the system generates corresponding planned orders.

To avoid this phenomenon, you should always maintain the purchase requisitions creation indicator in the planning group for the affected materials.

Best Regards,

R.Brahmankar

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos
former_member213946
Participant
0 Kudos

Hi Rupesh,

Parameters for mrp are -mrp run with option 02- pr in opening period.(2,3,1,1,1 mrp run values)

MRP group is available in material master

creation indicator active and maintained with value 3-(planned order), 1-(mrp list), 3- (schedule lines)

opening period maintained .

referred note-23922 and 206666.

pls suggest.

regards,

sanket.

former_member213946
Participant
0 Kudos

hi Caetano,

Checked above link below mentioned details are maintained.

unable to understand system behavior in above scenario -1.

pls suggest.

regards,

sanket.

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

Try to debug here to find out why MRP is creating planned orders:

LM61YF2D - ERMITTELN_DELKZ


BR

Caetano

former_member213946
Participant
0 Kudos

hi

analysed the issue and found solution ,

in my case their were two three jobs set which first uses total planning run and after that step goes on to customized zreport which excludes Stock transfer pln for pr conversion.

former_member213946
Participant
0 Kudos

hi

analysed the issue and found solution ,

basically it is mrp group will be selected

in my case their were two three jobs set which first uses total planning run and after that step goes on to customized zreport which excludes Stock transfer pln for pr conversion.