Skip to Content
0
Aug 03, 2016 at 01:37 PM

Limits in simultaneous Loads or Replicate jobs

94 Views

Hi guys,

I have a doubt about the user of SAP LT replication, we actually test and create a Connection to replicate SAP ECC tables to SAP HANA, the replication and loads work properly, but when create for example 10 replication jobs simultaneous and try to create 2 or 1 load jobs, the last one state in action Schedule, we need to suspend the first replication jobs to the loads begins and ends.

Thanks in advance for your help, btw i attached our actual configuration in LTR.

Attachments

ScreenShot153.jpg (54.3 kB)