cancel
Showing results for 
Search instead for 
Did you mean: 

what are the steps in multilevel configuration - sap vc? How it should be used in sales order? whether sales order will ask halb kmat to choose character value?

Mahendran8888
Contributor
0 Kudos

what are the steps in multilevel configuration - sap vc? How it should be used in sales order?

whether sales order will ask halb kmat to choose character value?

Accepted Solutions (0)

Answers (2)

Answers (2)

keyur_mistry1
Active Participant
0 Kudos

MAHENDRAN PARAMASIVAN,


First of all keep out your one by one (in logicla sequence) your assumption.


Point 1 - what are the steps in multilevel configuration - sap vc?

Reply:

I can't type here complete configuration. I will just give you ruff idea.

  1. For your configurable material create.
  2. CS01 to create BOM.
  3. Assign the component for that FG material.
  4. For every component you can assign the object dependency to select that component and you can assign the assembly, if the component have sub-component.

Point 2 - How it should be used in sales order?

Reply:

This is not the clear question. Why you can't use in sales order? As you are booking normal sales order. Just difference is, configurable material will ask for the configure the material at the time of order entry.


Always build your design like configuration should be done at FG level only. User should not go to the BOM material and configure them too.If your BOM components are also Configurable materials.


Your complete business idea will make your design easier.



Point 3 - whether sales order will ask halb kmat to choose character value?

Reply:

You can keep any material type for the configurable material.

It can be FERT, KMAT, HALB. As you know control called "configurable material" at material master data (Basic Data - 2).


Thanks,




Mahendran8888
Contributor
0 Kudos

Keyur,

     Thank you for your reply. And I know all the steps and i involved writing object dependancy for 2 years. Thats fine. I am good in single level configuration using a single kmat. I am not good with kmat can be used inside of kmat like halb kmat.I am not good in writing with Self, parent and root. I am looking for Multi level configuration( Kmat inside kmat) may be i am wrong. I am not good with Multi level bom configuration.

keyur_mistry1
Active Participant
0 Kudos

MAHENDRAN PARAMASIVAN,


You can do it. As I know, If you can configure single level then you can configure mutilevel BOM too.

Just create one small sample supper BOM for practice. What are the problem and misunderstanding you will face, post here the same.

Many SAP VC masters are here they will guide you very well and try to clear almost problems.

Mahendran8888
Contributor
0 Kudos

Thanks and try my best

Mahendran8888
Contributor
0 Kudos

i have so many assumption with multilevel configuration in sap vc