on 08-02-2016 6:17 AM
Hi All,
How to get WBS BOM on PR as I have created 'external activity' and assigned material on which PR was created so my requirement is get multiple material on single PR. As I can have WBS BOM on activity so same I need WBS BOM on PR so can anyone tell me how can I achieve this requirement from SAP standard.
Regards,
Faizan
Are you doing a BOM transfer to PS?
What material did you attach to the Network Activity as a component? Was it the BOM Header material?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
I think you need to go for an internal activity.
How to create a PR for BOM from a Project (WBS,... | SCN
Above useful thread can be referred.
-Shubham
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.