Continuous Production in SAP

256 Views

Hi

Can somebody explain or provide a link to configuring and master data setup for a PP-PI scenario? The demand is on yearly basis and want to know what should I do to achieve this requirement?

I set up a new lot sizing procedure, using the standard distribution key GLEI/S20/01 (assigned to the plant) and assigned these to the material in MRP1 & MRP4 (prod version) views respectively. Then I create a demand (MD61) into 12 monthly buckets and run MRP, MD04 shows the VSF for all months without any process orders. Planning strategy used is 40. I'm sure this approach is not correct or I'm missing something significant, do not know much about the continuous production set up.

PL. help.

thanks

BE