Hi, experts. i am new.
i am perfoming Supply Planning "Heuristic". I am looking at the Keyfigure Constrained Demand Plan Qty(CONSTRAINEDDEMAND) and this is equal Total Constrained Qty (TOTALCONSTRAINEDDEMAND).
i would like to know if there is a keyfigure that represent the Demand constrained equal 100% of resource utilization, i have only the alert overload.
I was looking for it in the SCM planning Operator and there is some disable configuration about "Constrained Demand and Supply".
Is it possible?

Thanks!
Fábio