Dear

Gurus,


I am trying to configure the system in a way that when I plan my Fert material through (md61) Prdversion wise, and convert its planned order into Production order through (co41) system should ask me what Prdversion to select for HALB material.

Ive gone through threads on scn and have done the following tasks but the system still not asking for the selection of prd version while on co41.

-OPL8-Order Type depedent parameters ( [1]Manual selection of production version)

-Selection Methods 2 and 3 in MRP4 for BOM Explosion methods for MRP. Tried both.

Thanks

shankar