Hi Experts,
Which i have checked for KE24 vs CJi3 total balance are correct,But in CJI3 cost elements are displayed 400000 to 400250.
If i checked in KE24 Cost elements are displayed 400000 to 400200 only, but total values are matched.400250 values are adjusted or allocated diff Cost elements such as 400000 to 400200 and i have identified through reference documents.Why the system is behaving like this and why this cost element 400250 value are allocated to other g/l's.
May be which i am excepting CO-PA side some problem. Let me know if any one share ideas.