Jul 29, 2016 at 10:39 AM

CEWB - Need advice for massprocessing production tools/ressources

187 Views

Hi there,

I have two requirements from our SAP users regarding massprocessing with production tools/ressources.

a)

Our work planners want to do a mass change for production tools (in this case documents) in the CEWB. They want to replace one specific document with the same DIS with a higher document version. If I try that, the massprocessing function is not active (gray in the menue).

We know the CA75n, but it would be nicer for the work planners to do as much in the CEWB as possible.

Is that possible with the CEWB?

b)

Is it possible to add a new document to more than one routing operation at the same time in CEWB (mass processing)?

We need to add one document to different routings and there to specific operations (dedicated workplaces).

This document has to be assigned to operations which have possibly already other assigned documents.

I found only the possibility to add a document step by step for the listed/selected Operation.

But a mass processing will be preffered.

Are there other transcations with which I can solve this?

Thank you in advance for your help and your hints,

Andreas Wehn