Skip to Content
author's profile photo Former Member
Former Member

Upload 80MaterialH job to BPC 7.5 fails(Hierarchy nodes include dimension members that do not exist)

Hi

We are currently experiencing some BPC hierarchy data loads from BW.

This is after a transport went to BW Prod to meet some of the requirements as wanted by the business.

The requirement was to add to folders under TOTAL_Material as indicated below

Herewith system details:

Source: BW (SAP_BW-740-0006-SAPKW74006-SAP Business Warehouse)

Target: BPC(CPMBPC-754-0003-CPM Business Planning Consolidation)

The BW Material data is as follows:

BW Error Log:

BPC:Error Log

Herewith the Transformation used:

Herewith the Conversion File used:

Prompt File:

NB: This job runs daily overnight and has been consistently working

Any other suggestion, advise, guidance and input is more than welcome.

If need be for more info please free to ask

Regards,

Herbert

Material.PNG (23.8 kB)
BW Error Log.PNG (49.6 kB)
BPC Error2.jpg (88.0 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 27, 2016 at 01:52 PM

    Before loading hierarchy you have to load members - new members in this case!

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.