Order Budgeting and control

Dears

We are using internal order budget for controlling the capex asset procurement.

We have activated budget availability control for the order type.

But I think even if we do not budget the order, it will allow the posting. Right ?

Is there a way to prevent the use of internal order for posting if it is not budgeted ?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Jul 25, 2016 at 06:19 AM

    Dear Nikki

    Please check the Define tolerance limits for availability control under the head of Budget and Availability control in SPRO. Thanks!!

    Regards

    MUR!!

    Add a comment
    10|10000 characters needed characters exceeded

    • Hello Nikki,
      Actually what you have described is because of the nature of availability control.The availability control of an order or a project can be activated in the standard system only if the order or (at least) one WBS element of the project has already been budgeted.
      If you want to change this, please refer to SAP Note 599813.
      Best regards,
      Miya

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.