Skip to Content

Batch Derivation with multi sender materials in a Order material BOM

Hi Gurus

In my case , we have two components which are included as Sender material to the respective Order Header material BOM.

Condition:

Batch derivation should happen during Order Release.

Production date needs to be updated in to Order Header material batch from its component material batch information

I tested with scenario , if i have one component (which is included as sender material) , Production date transferred from Component and updates into Order Header material batch .

But Lets say we have two components both are included as sender material for the order header material (Receiving material) , then how system will behave during order release.Which component Production date system will pick ?

Do we need to do any restriction with respect to Item category of the BOM component OR

Is it possible to use Item category in Batch Derivation scenarios

How to handle this scenario.

Kindly share your views.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jul 25, 2016 at 05:55 AM

    Hello,

    You can do this by using BAdi DERIVATION and method like RECIPIENT_VALUES_AND_STATUS.

    Best Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.