Hi,
I've got a ECC system 6.00 BASIS 7.00 SP 18 on Windows 2003 SP2 X64 with Oracle 10.2.0.2. I would like a technology upgrade for this system... so next year it will be upgrade to the last ECC release (6.08 at last).
I would like to create new VMs (one for dev, one for tst and one for prd) with Windows 2012R2 and Oracle 12.1 with last available patches.
I will do it with a system copy based on export/import. Is it possible? I read several notes and documentations but I haven't find any problem. Is it enough BASIS 7.00 SP18 to run Oracle 12.1? I've find only an issue with statistics update solved by a note with code correction. Last SWMP, can it export the db from a 10.2.0.2 Oracle release?
Thank you so much.
Regards.