How do you track material in SAP with different methods of transport?

SAP Gurus,

I need help. My current setup is material X with appropriate lead times. However, these lead times were established well before myself and do not take the different modes of transportation in consideration. I.E. Our main method of shipping overseas is boat. So my lead times for Material X is 28 days. However material X may need to be air chartered for production support for better delivery timing which only takes on average 6 days (Through customs). SAP cannot take both methods into consideration (That im aware of). This greatly affects my purchasing/materials as the visibility of material is skewed by invalid lead times.

How can I setup my system to accommodate for Air,Sea, Train, and Truck shipments? The only thing that I can think is creating a different material # master for each so if its traveling by train I can create Material XTRA and the Material XA for air. However, everything on the backend would have to be maintained as well and my company will not buy in for that. What are youre thoughts on this? There has to be a more efficient way than what we are currently doing and what I am thinking about doing. Any Ideas would greatly be appreciated!

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Jul 28, 2016 at 02:44 PM

    Hi,

    In SCM system, we can define one transportation lane with different means. You can check this in tx /SAPAPO/TL1.

    Regards,
    Claire

    Add a comment
    10|10000 characters needed characters exceeded

    • Yes APO allows different Means of Transport. The issue is that the selected MOT does NOT cif to ECC so you will not know if APO selected Air or Ground.

      Is your issue for Sales Orders where you can have Routes with different durations or PO's?


      I am not aware of how to have different dates for PO scheduling in ECC.

  • author's profile photo Former Member
    Former Member
    Posted on Jul 29, 2016 at 07:55 AM

    Hi Brett,

    What i have understood is, your requirement is that the mode of transport ( Lead Time) will be substituted for a same material depending upon some business conditions.

    So under what Business conditions you're deciding it whether to be Air/Ship thats the Key point. we need to decide and design the solution based on this Key point.

    What planning methodology you're using ?? SNP Heuristics / Optimizer ??

    If SNP Optimizer is being used then MOT is decided based on the priority, duration time, costs, and delay penalty costs for transportation AND ofcourse with respect to the demand situation.

    Just my thoughts

    Vinoth

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.