material is under reservation

Hai,

I am facing the problem, a problem is during production order i came to know that material under reservation.

In OPL8 order type dependent parameter i maintain 1 NEVER. but in the production order it taking option 3 automatically

If i release the production order we can to know that the material under reservation

Please guide me how to solve this issue

1.JPG (74.2 kB)
Capture.JPG (27.9 kB)
3.JPG (57.3 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 21, 2016 at 02:51 PM

    Hello Leo,

    After you do the setting in OPL8 it will not reflect in existing production order.

    Create a new production order via CO01 without any reference of old production order and then check, it should work.

    Best Regards,

    Ameya Beri

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.