Hi,
We have 4 operations- 0010, 0020, 0030 & 0040 for the Production order and Inspection characteristic is assign at operation 0030.
Suppose the Order Qty is 10 PC, if i confirmed 4 PC upto operation 0020, then and reject the characteristic for 5th item. But system is allowing me to confirm the 5th item
How can i control this?. I want system should not allowed to confirm the operation for 5th item but allow to confirm for 6th to 10th item, if the characteristic is accepted.
All this items are serialization number.