How to fetch equipment wbs data to the wbs field under order additional data tab

Hello Gurus,

I have a requirement that if in a equipment master WBS field is maintained then while creating order for the same equipment the additional tab WBS field under order should fetch the WBS data from the equipment automatically.

More over what is the difference between order location tab wbs and additional tab wbs?

I have attached the screenshots also.

Regards,

Sameer

equipment wbs.png (15.3 kB)
order wbs.png (20.4 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Posted on Jul 25, 2016 at 06:13 AM

    Hi Sameer,

    WBS from the Equipment is copied on the Location Tab of the Work Order and not on the additional tab WBS field.

    You have to go for enhancement to achieve the same

    For copying it into the location tab, please maintain the below config for your order type.

    Maintenance and Service Orders--->Functions and Settings for Order Types---> Define Transfer of Project or Investment Program

    Order Type Copy Assignment

    PM01 X

    Now for your second query:

    WBS in location tab of PM Order .This WBS can be used for defaulting the settlement rule. This can also be set in the technical object master data and the default can then be derived from there.

    WBS in additional data tab: Here the WBS element can be entered for planning and budgeting purpose purpose. You can assign the WBS element of the project here and then this order will become visible in the project planning . Also you can copy the dates from the Network to Order Basic Dates.



    Regards




    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 22, 2016 at 01:24 PM

    Hi,

    You can use exit IWO10010 to determine the WBS element.


    -Paul

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 24, 2016 at 07:03 AM

    Hi Sameer,

    Is this not happening automatically ?

    Refer below thread

    Assignment of PM/CS Orders to Projects - Maintenance and Service Processing - SAP Library

    Regards

    Terence

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.