Hai,

Take a example I was created 5 Material
MMR (material master record I created and maintained)
Finished material : Unit_fert Base unit / Work scheduling issuing unit 1 M
Semi finished material : Unit_halb Base unit / Work scheduling issuing unit 1 M balance 9 m
Semi finished material : Unit_halb1 Base unit / Work scheduling issuing unit 1kg / 10M balance 9 kg
Semi finished material : Unit_halb2 Base unit / Work scheduling issuing unit 1L / 10 KG
Raw material : Unit_roh Base unit / Work scheduling issuing unit 1 L
If i run MRP and start doing the production the below steps should be happen, but i my case it calculating all quanty as 1 one with the base unit only and in 101 movement also it considering the base unit only
Please help me how to map it in sap
Step - 1
I procured raw material (unit_roh) 1 L
Step - 2
I convert planned order to Production order it means that it should consume unit_roh (1 L ) and it should add 10 Kg in unit_halb2 in 101 movement
Step-3
I convert planned order to production order it means that it should consume unit_halb2 1 kg and it should add unit_halb1 10 M in the movement 101
Step -4
I convert planned order to production order it means that it should consume unit_halb1 1 M get consume and unit_halb 1 M should be add