How to handle the material with different unit of measurement in every stage

Hai,

Take a example I was created 5 Material

MMR (material master record I created and maintained)

Finished material : Unit_fert Base unit / Work scheduling issuing unit 1 M

Semi finished material : Unit_halb Base unit / Work scheduling issuing unit 1 M balance 9 m

Semi finished material : Unit_halb1 Base unit / Work scheduling issuing unit 1kg / 10M balance 9 kg


Semi finished material : Unit_halb2 Base unit / Work scheduling issuing unit 1L / 10 KG

Raw material : Unit_roh Base unit / Work scheduling issuing unit 1 L

If i run MRP and start doing the production the below steps should be happen, but i my case it calculating all quanty as 1 one with the base unit only and in 101 movement also it considering the base unit only

Please help me how to map it in sap

Step - 1

I procured raw material (unit_roh) 1 L

Step - 2

I convert planned order to Production order it means that it should consume unit_roh (1 L ) and it should add 10 Kg in unit_halb2 in 101 movement

Step-3

I convert planned order to production order it means that it should consume unit_halb2 1 kg and it should add unit_halb1 10 M in the movement 101

Step -4

I convert planned order to production order it means that it should consume unit_halb1 1 M get consume and unit_halb 1 M should be add

Picture1.png (14.5 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 21, 2016 at 01:47 PM

    Hi,

    Did you Tried with production UOM in Work Scheduling View.

    Regards,

    Dinesh V.

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      In addition to all the above,

      In MM02, Click on Additional Data and in the next screen maintain UOM Conversion e.g., Basic UOM is L and Production UOM is Kg. So you have to maintain something like 1 L = 5 Kg.

      Then during GR system will propose Production UOM.

      Likewise Issuing UOM also. Try in System by maintaining Production/Issuing UOM and note the difference.

      Regards,

      Dinesh V.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.