CHANGE CODE MATERIAL IN ACTIVITY NETWORK

Dears,

Is there any possibility to change the code of a material inserted into an activity network diagram? Example: a material code has been inserted in multiple operations and I would like to change the code without deleting the material.

Thank you

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jul 21, 2016 at 05:18 AM

    Hello Jeronimo,

    No i don't think so you can do that.. As material code is picked up from the material master.. changing code is as good as replacing the old material with new one..

    Regard

    Sammar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.